|
Highways
40 through 49
STH-40 | I-41 | US-41 |
STH-42 | SPUR STH-42 | I-43 | STH-44 | US-45 | STH-46 | STH-47 | STH-48 | STH-49 | Jump
to Bottom
|
|
|
Southern Terminus: |
Jct US-12 & STH-29
northwest of Elk Mound |
Northern Terminus: |
STH-27/STH-70 at cnr Clark Ave & Omaha St
in downtown Radisson |
Length: |
81.56 miles |
|
Map: |
Route
Map of STH-40 |
|
Notes: |
As
a part of the conversion of STH-29 between I-94 at Elk Mound and
Chippewa Falls to a limited-access expressway/freeway combination,
both US-12 and STH-40 were relocated at their interchange with
I-94 at Elk Mound (Exit 52). Construction on the relocation began
in 2000 and was completed in the fall of 2001. |
|
History: |
STH-40,
as originally designated and signed in 1918, utilized its present-day
corridor from STH-14 (now US-8) at Bruce northerly to STH-70 (now STH-27/STH-70) in Radisson. However, approximately on year
later, STH-43 (now part of STH-27), which ran from Cadott northerly
to Ladysmith, was extended northly via present-day STH-27 to
CTH-A, then northwesterly via CTH-A to STH-40, then northerly
again supplanting the STH-40 designation into Radisson. This
reduced STH-40 to a short connector route between Bruce and STH-43 north of Bruce. However, by 1924 STH-40 had been extended on
the south along its present route from Bruce through Island Lake,
Bloomer and Colfax to terminate at STH-116 (now STH-29) north
of Elk Mound. |
|
|
In 1937, STH-40 was
realigned on its southern end from Colfax to utilize a more direct
route to the US-12 & STH-29 junction.
When a new, "straight-as-an-arrow" alignment for STH-27 heading
due northerly from Ladysmith was completed in 1945, the former
route of STH-27 from
north of Ladysmith to STH-40 as well as all of STH-27 (nee
STH-40) from that point northerly was turned back to local control.
In addition, the "spur" of STH-40 from Bruce northerly
to STH-27 north of Bruce
was also turned back to local control and the entire Bruce-to-Radisson
route was designated CTH-H. However, the State Transportation
Commission reversed themselves in 1952 when the entire length
of the "original" STH-40 route (from Bruce to Radisson)
including the portion which had been redesignated as STH-43-then-STH-27 in
the past were returned to the state trunkline system as an extension
of STH-40, bringing the highway to its present-day length. |
|
|
During
1999, a western bypass of the Village of Bruce was constructed
to carry STH-40 directly south from a sharp turn in the highway
northwest of downtown to a new intersection with US-8 on
the western end of the village. STH-40 then turned easterly along US-8 back
it its existing alignment on Main St downtown. The former route
was turned back to local control and designated BUS
STH-40. |
|
Freeway/Expwy: |
None. |
|
Business Connection: |
BUS
STH-40 - Bruce: Site contributor Eric Nyman reports
a BUS STH-40 route
exists through the small community of Bruce in Rusk Co, west
of Ladysmith. It runs from jct US-8 & STH-40
in Bruce and heads northerly via Main St to Railroad Ave and
westerly via Railroad back to STH-40 west of town. —Thanks
Eric! |
|
Photographs: |
|
|
Weblinks: |
WIS
29 corridor maps - WIS 29/US 12/WIS 40 Interchange -
diagram of the new (2001) interchange configuration at the
southern terminus of STH-40 at jct US-12 & STH-29 from
WisDOT. |
|
|
Southern Entrance: |
From Illinois concurrently w/I-94 and US-41 in the
southwestern corner of Pleasant Prairie southwest of Kenosha |
Northern Terminus: |
Jct US-41/US-141 & I-43 in Howard, immediately northwest of Green Bay |
|
Length: |
175.4 miles |
Map: |
Route
Map of I-41 |
Notes: |
The Interstate 41 route designation was added in Wisconsin on April 7, 2015 with the sole purpose of allowing the cities of Fond du Lac, Oshkosh, and the Fox Cities of Appleton, Nenah and Menasha to reside along an Interstate Corridor. While improvements to the route of US-41 between Milwaukee and Green Bay have been ongoing for many decades, with final conversion to a full freeway facility being achieved in 2001, civic leaders and business interests in the region felt the area was still hampered by not having "Interstate access," even though the are had full freeway access. This is similar to the situation in the 1990s where Central Wisconsin had full freeway access to the rest of North America via the US-51 freeway linking Wausau, Stevens Point and other area cities to I-90/I-94 at Portage, however the lack of the perceived "prestige" of a "true" Interstate route led civic leaders and politicians to add the I-39 designation to the existing freeway route. In the case of US-41, no actual changes to the highway itself has occurred due to the addition of the I-41 designation, since it had been a full freeway for nearly 20 years prior to that. Other than a rerouting of the underlying US-41 designation in the Milwaukee area, the primary thing the introduction of the I-41 designation has brought to the US-41 corridor are hundreds and hundreds of new route marker signs. |
|
As alluded to above, the I-41 route designation is 100% duplicated by the US-41 designation throughout its entire length. To reduce the confusion of multitudes of additional route marker signs, however, WisDOT chose to only sign US-41 along the route itself (on what are referred to as "reassurance assemblies" of route markers posted on the side of the highway after each interchange or junction). On the large overhead freeway guide signs and on signs pointing the way to I-41/US-41 from intersecting routes, motorists will only see I-41 markers. At either end of I-41 near the Illinois state line and in the Green Bay area, however, WisDOT posted signs in September 2015 instructing motorists "NORTH US-41 FOLLOW NORTH I-41" (at Pleasant Prairie) and "SOUTH US-41 FOLLOW SOUTH I-41" |
|
Wisconsin, known over the past decade or two as a state featuring many miles of concurrent highway route designations, including the longest "three-way Interstate route concurrency"—30 miles of I-90/I-94/I-39 between Madison and Portage—is now home to several more concurrent routes with the debut of I-41 in the state. They include:
|
|
|
Only approximately 0.9 miles of I-41 exist outside of Wisconsin. Technically, the official route of I-41 begins where US-41 joins I-94 just south of the Illinois/Wisconsin state line and runs concurrently with I-94 and US-41 between that point and the state line. However, as of late 2016, IDOT has not yet chosen to sign their 0.9-mile segment of the new Interstate route in Illinois. |
|
|
In another illustration of the "overlay" characteristics of the I-41 route designation, in any of the circumstances where I-41 runs along another route, the interchanges along those portions of I-41 do not use I-41 milemarkers. Indeed, none of I-41 is posted with it's own milemarkers—technically, the milemarkers along the route from the Zoo Interchange in Milwaukee northerly to Green Bay are those of US-41. From I-41's southern terminus to the Mitchell Interchange near Milwaukee, I-41 uses I-94's milemarkers (running in the opposite direction as I-41's theoretical milemarkers), while along the entire length of the I-894 Milwaukee Bypass, I-41 uses I-894's milemarkers. |
|
History: |
US-41:
The Complete History. Since the route of I-41 is 100% concurrent with US-41, please consult the detailed history of US-41 which includes a year-by-year breakdown
of its changes and realignments over the decades. That page can be found
in the In Depth section of this website. |
|
|
According to the Wisconsin Transportation
Commission's "Wisconsin
Highways 1945-1985," the original Interstate connection between
Milwaukee and Green Bay was to be along the route of US-41. It
notes that in December 1956, "A Milwaukee-Green Bay
(Hwy. 41) route was approved, but the state failed to get plans
completed in time to meet a deadline and the effort failed, according
to G. H. Blake, a legislator at the time." In the end, Green
Bay's Interstate connection came along the US-141 corridor along
Lake Michigan, and was built largely during the 1970s, while the
route of US-41 in the Fox Valley was slowly upgraded over the years
to freeway status. US-41 between greater Milwaukee and Green Bay eventually received its Interstate designation April 7, 2015 with I-41 signs erected along the corridor later in the year. |
|
Freeway: |
The entire route of I-41, being an Interstate highway, exists as freeway. |
|
NHS: |
The entire route of I-41, being an Interstate highway, is on the National Highway System |
|
Business Connections: |
None.
|
|
Continue on: |
US-41
southerly into Illinois – via Rich Carlson's
Illinois Highways website. |
|
Photographs: |
|
|
Weblinks: |
US-41:
The Complete History – a detailed history of US-41 along with a year-by-year breakdown of the changes
and realignments to the route over the decades.
US-41 Interstate Conversion – project website from WisDOT.
Interstate 41 – from the Interstate Guide website. |
|
|
Southern Entrance: |
From Illinois concurrently w/I-94 and I-41 in the
southwestern corner of Pleasant Prairie southwest of Kenosha |
Northern Entrance: |
From Michigan on the Interstate Bridge spanning
the Menominee River between Menominee, Michigan and Marinette |
Length: |
224.27 miles |
|
Map: |
Route
Map of US-41 |
|
Notes: |
It is safe to say US-41 has been one of
the more interesting highways in Wisconsin over the past decade
or so, with massive upgrades, construction and relocations so that
90% of the route is currently four-lane (or more) divided highway,
with a total of 87% built to either freeway or expressway standards.
The two remaining portions of US-41 which are not four or more
lanes limited-access are the Lisbon & Appleton Ave portion
in Milwaukee and the segment from Oconto to Peshtigo, as well as
a short portion through Marinette. |
|
|
One
of the biggest projects along US-41 has been the conversion of
the expressway connecting Metro Milwaukee and Green Bay to a full
freeway, with access only at interchanges. Originally, only short
portions of US-41 in the Appleton and Green Bay areas were built
to full freeway standards, while the remainder of the route was
slowly upgraded to expressway quality, first, and now to freeway
standards. Freeway conversion began during the 1960s and during
the very late 1990s, was nearing completion with a flurry of work
in Washington, Dodge and Fond du Lac Counties in the south and
in Brown Co in the north. As of 2001 all of the remaining
crossroads had been closed, diverted or grade-separated and US-41
was officially a fully-controlled access freeway from the north
side of Milwaukee to well north of Green Bay. See the US-41:
The Complete History page for complete historical
details. |
|
|
The
last major at-grade intersection in Fond du Lac Co at CTH-N/CTH-I
northwest of Fond du Lac was converted to a freeway interchange,
completed in 2001, with US-41 overpassing CTH-N/CTH-I. Simultaneously,
the four remaining crossroad intersections in Fond du Lac Co either
received grade separations or had access completely removed to
convert this portion of expressway to freeway. In Outagamie and
Brown Counties, construction was underway at the same time to convert
that segment of expressway to freeway. Frontage roads were added
to much of this route, removing access from US-41 for local roads
and residential driveways. Two interchanges were constructed in
this 10-mile stretch at CTH-U/CTH-DD and CTH-S. The freeway conversion
project between Kaukauna and De Pere cost $35
million when it was completed in 2001 it opened two years earlier
than originally anticipated. |
|
|
Major
changes to the routing of US-41 occurred in Milwaukee County in
1999. Instead of departing I-94 at
Exit 325 at the Milwaukee/Racine Co line as it has since I-94 was
completed in the 1960s, US-41 is now routed concurrently with the I-94/North-South
Frwy through
the southern Milwaukee Co suburbs to the Mitchell Interchange (jct I-94 & I-894/I-43),
then continues northerly with the I-94/I-43/North-South
Frwy into downtown Milwaukee. There, US-41 follows I-94 through
the Marquette Interchange and westerly via the East-West
Frwy toward
the Stadium Interchange west of downtown where it rejoins its former
routing at the Stadium Frwy and continues northerly as before.
The former route of US-41 along S 27th St from the Milwaukee/Racine
Co line to STH-24/Forest
Home Ave in southern Milwaukee has been re-designated STH-241,
while S Layton Blvd between STH-24/Forest
Home Blvd and STH-59/National
Ave is no longer a state trunkline highway. The portion of the Stadium Frwy rebuilt to carry it around Miller Park construction
and temporarily re-titled the "Stadium
South Arterial" received a brand-new, yet hidden (unsigned) STH-341 designation
and the more official "Miller Park Way" name.
In an August 2, 1999 article, the Milwaukee
Journal-Sentinel wrote: "The
renumbering follows a successful battle by south side residents
and city officials to block the widening of Layton Blvd. between
National Ave. and W. Lincoln Ave., a plan that would have sacrificed
280 trees. DOT officials relented and agreed to let the city rebuild
the street within its current width. But they said the rebuilt
street would not meet highway standards and could not retain its
designation." |
|
|
Michael G. Koerner noted in misc.transport.road that WisDOT has been exploring the idea of constructing a pair
of bridges over Lake Butte des Morts near Oshkosh to solve some
of the problems the current causeway is causing. Michael writes: "The
fill and its three rather short bridges have been causing several
problems, such as 'cutting' the lake in half, preventing the water
from circulating like it should, and the snow on the lake ice blowing
over the highway in winter has caused numerous bad accidents. Both
problems would be corrected with such a long bridge (the water
would circulate freely and the snow would blow safely under it)." He
also notes these new bridges would likely be six-lane, 'Interstate-compatible'
structures. |
|
|
Interestingly, WisDOT's "Official
State Trunk Highway System Maps," still contains a "mapped
corridor"
for US-41 through the near northwest side of the City of Milwaukee,
roughly along the line of the proposed Stadium
(North) Frwy,
which was cancelled in the 1970s. While most other originally "mapped
corridors" have been erased from the trunkline system maps
(if not from memory), this one corridor has been allowed to remain
as a dashed line connecting the northern stub end of the never-completed Stadium Freeway with the
southern end of the STH-145/Fond
du Lac Frwy,
running parallel to W Lisbon Ave and Appleton Ave to 60th St, then
following 60th St northerly to Fond du Lac Ave. Whether for political
or historical reasons, the corridor remains on the books, although WisDOT seems
completely disinterested in building any new highway in the corridor
nor do they seem poised to reroute US-41 via 60th St northerly
to Fond du Lac Ave, although this change may make some sense. [See
the Milwaukee
County map from the OSTHSM booklet.] |
|
|
On
a January 1998 trip along US-41, it was noted that all of the exit
numbers on US-41 between the jct of US-41 & US-45 in Milwaukee
(formerly Exit 47) and jct STH-33 (formerly Exit 72) had been removed.
The milemarkers have remained along the entire route, but the exit
number "tabs" on
the advance exit signs have been removed and the exit number signs
in the gores have also changed to plain "EXIT" signs.
All exit numbers from Oshkosh to Suamico remained, however. Within
a few years, new exit numbers had been installed... completely
identical to the former ones! However, all interchanges along US-41
from Milwaukee to Abrams now feature exit numbers, a definite plus
to the tens of thousands of motorists who travel corridor each
day. |
|
|
The
75-year old US-41 Interstate Bridge spanning the Menominee River
and linking Marinette with Menominee, Michigan was completely removed
and replaced with a brand new bridge on the same location beginning
with the sturcture's closure to traffic on Nov 1, 2004. During
the project, US-41 traffic was detoured via the 26th St bridge
just upstream—ironically the route of US-41 prior to 1929!
The new structure was opened to traffic on Nov 22, 2005 and on
Dec 3, 2005 a ribbon-cutting was held at the center of the bridge
officially wrapping-up the 16-month project. According to Dick
Lund's excellent
photo-essay of the construction, the Honorary Ribbon-Cutter
at the ceremony was Mrs. Catherine (VanCamp) Anderson, "who,
as a girl of 12 was a holder of the ribbon which was cut to open
the previous Interstate Bridge in a 1930 ceremony." |
|
History: |
US-41:
The Complete History. So
as to not make this highway listing exceeding long, a complete
and detailed history
of US-41 including a year-by-year breakdown
of its changes and realignments over the decades can be found
in the In Depth section of this website. |
|
|
According to the Wisconsin Transportation
Commission's "Wisconsin
Highways 1945-1985," the original Interstate connection between
Milwaukee and Green Bay was to be along the route of US-41. It
notes that in December 1956, "A Milwaukee-Green Bay
(Hwy. 41) route was approved, but the state failed to get plans
completed in time to meet a deadline and the effort failed, according
to G. H. Blake, a legislator at the time." In the end, Green
Bay's Interstate connection came along the US-141 corridor along
Lake Michigan, and was built largely during the 1970s, while the
route of US-41 in the Fox Valley was slowly upgraded over the years
to freeway status. US-41 between greater Milwaukee and Green Bay eventually received its Interstate designation April 7, 2015 with I-41 signs erected along the corridor later in the year. |
|
Freeway: |
US-41 is a freeway from the route's southern entrance at the Illinois state line northerly to jct US-41 & US-141 at Abrams. (191 miles) |
|
Expressway: |
The remaining expressway segment of US-41 begins at the northern end of the freeway at jct US-41 & US-141 (Exit 187) at Abrams northerly to Roosevelt Rd on the western city limit of Marinette. (31.8
miles) |
|
NHS: |
The entire length of US-41 in Wisconsin is on the National Highway System. |
|
Circle Tour : |
Lake
Michigan Circle Tour: From I-43 at Exit 191 in Green
Bay to US-41's entrance into Michigan at Marinette/Menominee. |
|
Business Connections: |
Former
BUS US-41 - Oshkosh: While
this business routing was not an official state trunk highway designation,
it followed along other state trunk highways for its entire
length, and so became, by default, a state highway. BUS US-41 at
Oshkosh began at US-41 Exit 116 southwest of downtown and
ran northeasterly via STH-44 along
South Park Ave, Ohio St, Wisconsin St, and Irving Ave to US-45/Jackson
St. From there, BUS
US-41 turned north to run with US-45 and STH-76 along
Jackson St northerly to US-41 at Exit 124, where it terminated.
(For whatever reason, this BUS
US-41 routing was removed from the Official
State Highway Map in 1983. The route signage itself was removed
by the early 2000s.) |
|
|
Former
BUS US-41 - Appleton: This routing of BUS US-41
was also a locally-designated route, although a portion of
the route did run along other state trunklines. Appleton's
BUS US-41 began at US-41 at Exit 137 and ran easterly via
College Ave, concurrently with STH-125 to STH-47/Memorial
Dr-Richmond St, where it turned northerly to follow Richmond
St concurrently with STH-47 for
12 blocks. At STH-96/Wisconsin
Ave, BUS US-41 turned easterly for 2 miles to CTH-E/Ballard
Rd, where it turned northerly again to run via locally-maintained
CTH-E/Ballard Rd for less than 2 miles, ending at US-41 Exit
144. This BUS
US-41 routing was removed from the Official State Highway
Map in 1999 and, according to site contributor Peter Johnson,
all BUS US-41 signs
were removed from the route in 2004. —Thanks Peter! |
|
|
BUS
US-41 - De Pere (Green Bay): Prior to its complete
removal, the status of this route changed from an official
state trunkline designation to a locally-signed an maintained
route, for the most part. Prior to 1998, BUS
US-41 existed thusly: From US-41 at Exit 163B, BUS
US-41 existed as an officially-designated state trunk highway
to its merge with STH-32 along
Ashland Ave, then continued northerly via Ashland co-signed
with STH-32 to Lombardi
Ave, where both STH-32 and BUS
US-41 turned westerly to pass Lambeau Field. At the intersection
of Lombardi Ave & Military St, STH-32 continued
straight toward US-41, while the BUS
US-41 designation changed from an official state trunkline
designation to a locally-maintained and signed routing along
Military St. Official WisDOT sources
labled Military St as "Business
41 - Under Section 84.02(6)." At
the northern end of this stretch, where Military St meets Velp
Ave, the BUS US-41 designation
once again became an official state trunk highway designation
and turned westerly to follow US-141/Velp
Ave to its end at US-41. While WisDOT had
removed this routing as an official state trunk highway designation,
it continued to be signed along its pre-1998 routing for several
years. One of the reasons why it is assumed WisDOT made such
a move was that Lombardi Ave, formerly STH-32 and
along which BUS
US-41 travels, was transferred to local control, and is
now designated CTH-VK. The BUS
US-41 routing at De Pere/Green Bay was removed from the
Official State Highway Map in 1993 and, according to site contributor
Peter Johnson, all BUS
US-41 signs were removed from the route in 2004. Interestingly,
the set of freeway ramps running between US-41 at Exit 163B
in Ashwaubenon to STH-32/Ashland Ave in De Pere is still considered
to be BUS US-41 by WisDOT, meaning the route still exists,
albeit as a 0.67 mile highway! —Thanks
Peter! |
|
|
BUS
US-41 - Oconto: The former route of US-41 through Oconto prior to completion of the US-41 bypass in 2009 was turned back to local control and designated as BUS US-41, but locally-maintained (not a state trunk highway). |
|
|
BUS
US-41 - Peshtigo: The former route of US-41 through Peshtigo prior to completion of the US-41 bypass in 2009 was turned back to local control and designated as BUS US-41, but locally-maintained (not a state trunk highway). |
|
Continue on: |
US-41 northerly into
Michigan – via the Michigan Highways website.
US-41
southerly into Illinois – via Rich Carlson's Illinois Highways website.
US
41 – Charles Sarjeant's Illinois
Highways Ends website. |
|
Photographs: |
|
|
Weblinks: |
US-41:
The Complete History – a detailed history of this
highway along with a year-by-year breakdown of the changes
and realignments to the route over the decades. |
|
|
US-41 Interstate Conversion – project website from WisDOT. |
|
|
Interstate 41 – from the Interstate Guide website. |
|
|
Exit
numbers on US 41 – from WisDOT (from I-94 at the Zoo Interchange northerly only). |
|
|
Milwaukee
Freeways –
including articles on freeways traversed by US-41: North-South
Frwy, Airport Frwy, Zoo Frwy and Fond
du Lac Frwy. |
|
|
US-41 Project –
a WisDOT website detailing the upgrades along US-41 around Oshkosh and Neenah and from De Pere past Green Bay to Howard. |
|
|
Southeastern
Wisconsin Regional Planning Commission – known
as "SEWRPC" or "Sewer-Pac," this organization
provides basic information and planning services for the Southeastern
Wisconsin Region. |
|
|
Interstate
Bridge (US-41) Project – a photo-essay website
detailing the complete demolition and reconstruction of the
US-41 Interstate Bridge spanning the Menominee River between
Marinette, Wisc. and Menominee, Mich. An excellent site by
Dick Lund. |
|
|
Southern Terminus: |
Jct STH-23 & STH-28 (cnr of 14th St & Erie
Ave) in central Sheboygan |
Northern Terminus: |
Northport (2 miles east of Gills Rock) at
the Washington Island ferry dock |
Length: |
137.76 miles |
|
Map: |
Route
Map of STH-42 |
|
Notes: |
After World War II, the idea of memorializing
the accomplishments of the 32nd Infantry Division gained favor
and the follow statute was enacted:
"84.104
32nd Division Memorial Highway. In order to commemorate the 32nd Infantry Division,
also known as The Red Arrow Division, which, while composed mainly
of men from Wisconsin, Illinois and Michigan, brought fame and
glory to these states during World Wars I and II by their sacrifice,
devotion and bravery and which is now established as a Wisconsin
national guard division, the department [of transportation] is
directed to establish a highway memorial designated route 32 by
renumbering certain existing highways linking Illinois and Michigan
through Wisconsin. Beginning at the Illinois-Wisconsin state line
renumber state trunk highway 42 to a point where it joins the present
Wisconsin state trunk highway 32 at Sheboygan;..."
This meant
all of STH-42 south of Howard's Grove (7 miles northwest of downtown
Sheboygan) was re-designated as an extension of STH-32 through
Port Washington, Milwaukee, Racine and Kenosha to the Illinois
state line. The 7-mile stretch of STH-32 between Howard's Grove
and downtown Sheboygan was then re-designated as STH-42. |
|
|
The Sturgeon Bay bypass routing of STH-42/STH-57 was completed c.1977, removing those highways from the old downtown
routing and the historic bridge crossing Sturgeon Bay. Prior to
that, though,an interesting emergency situation occurred when a
ship hit the Sturgeon Bay bridge in 1960. According WisDOT's book "Wisconsin
Highways 1945-1985," "Round-the-clock
ferry service was established almost immediately for cars and trucks
to keep traffic moving on Hwys. 42 and 57. The state also leased
a barge to serve traffic for the three weeks that it took to repair
the main bridge." |
|
History: |
In
1918, the original routing of STH-42 began at the Illinois state
line south of Monroe and continued northerly via the present-day STH-69 corridor
through Monroe, Monticello and New Glarus, terminating in Verona
at STH-19 (later US-18/US-151,
now CTH-MV). During the state trunkline expansion of 1923, the
first iteration of STH-42 was supplanted entirely by an extension
of the route of STH-31 (which
ran along today's US-151 from
Manitowoc to Madison and Verona, then southerly via STH-42 to
the Illinois line). The second iteration of STH-42 dawned when
a highway beginning at STH-17 (later US-141)
at Cedar Grove and proceeding northerly via present-day STH-32 to
Howards Grove, then continuing northerly via the present STH-42
corridor to STH-31 (now US-151)
southwest of Manitowoc. From there, STH-42 continued northerly
via the present-day Vista Rd and CTH-R/Rapids Rd corridors, ending
at jct STH-16 (later US-141)
and STH-18 (later US-10)
at "Four Corners," at the cnr of Menasha Ave-Plank
Rd & Rapids
Rd. |
|
|
A
pair of major extensions to the route of STH-42 occurred in 1930
when it was extended southerly to the Illinois state line and
northerly to near the tip of the Door Peninsula. From Cedar Grove,
STH-42 was concurrently desginated with US-141 via
Port Washington into downtown Milwaukee where it then supplanted
the STH-15 designation
southerly through Cudahy, South Milwaukee, Racine and Kenosha,
terminating at a connection with IL SR-42 at the state line.
From southwest of Manitowoc, STH-42 then turned northeasterly
via STH-31 (now US-151)
into downtown where it then supplanted the route of STH-17 northerly
through Two Rivers, Kewaukee, Algoma, Sturgeon Bay and Egg Harbor,
terminating at STH-57 (recently
redesignated from STH-78) in Sister Bay. In 1934, STH-42 was
extended northerly from Sister Bay through Ellison Bay to a new
terminus at Gills Rock. |
|
|
In
1951, all of STH-42 from Howards Grove southerly to the Illinois
state line was redesignated as an extension of STH-32 as
part of the effort to designate the 32nd
Division Memorial Highway. STH-42 was then rerouted
southeasterly from Howards Grove over what had been STH-32 to
a new terminus in downtown Sheboygan. In 1956, STH-42 was extended
from Gills Rock to Northport at the tip of the Door Peninsula.
Also in 1956, a westerly US-141 bypass
of Manitowoc was completed and STH-42 was routed along the bypass
from US-151 northerly
to US-10 at Waldo Blvd
then easterly via Waldo back to the highway's former route. |
|
|
In
1959, a realignment of US-141 north
of Sheboygan lengthens the concurrent segment of US-141 with
STH-42 terminus northwesterly from 15th St to the present-day
cnr of Calumet Dr & N 40th St. Seven years later
in 1966, the northern half of the US-141 Sheboygan
bypass was completed and STH-42 continued by itself for the first
time to its southern terminus in central Sheboygan. In 1969,
the rest of the US-141 Sheboygan
bypass was completed and STH-42 from its jct with US-141 into
central Sheboygan was co-signed with BUS US-141, which then continued
via the former route of US-141 southerly
back to the new bypass route south of the city. In c.1977, the
Sturgeon Bay bypass was completed (see note above). |
|
|
With
the removal of US-141 in
the Sheboygan area in 1980, what had been designated BUS US-141
via Sauk Trail (present-day Business Dr), 14th St, Michigan Ave,
13th St, and Calumet Dr was—for some odd reason—redesignated
as BUS STH-42! STH-42 was scaled back to end at the new I-43 interchange
northwest of the city, and BUS STH-42 continued from that point,
through the city of Sheboygan, ending at I-43 Exit
48 (now Exit 120). In this sense, BUS STH-42 was not a business
routing for STH-42, but for I-43!
(Since Wisconsin refuses to use the Interstate Business Loop designation,
this may have have been the 'next best thing.') About 1990, with
the relocation of STH-28 to
its present routing between Sheboygan Falls and Sheboygan, it seems
the STH-28 designation
was extended through the city of Sheboygan along what had been
BUS STH-42, all the way to I-43 at
Exit 56 (now Exit 128), with STH-42 retaining its 1980 terminus
there. By 1993, however, the highway situation at Sheboygan had
been finally straightened out so that STH-42 entered the city from
the northwest, ending at a three-way terminus for STH-23, STH-28 and
STH-42. |
|
Freeway: |
None. |
|
Expressway: |
The Sturgeon Bay bypass, concurrently with
STH-57, from the southern
BUS STH-42/BUS
STH-57 junction at Green Bay Rd to the northern
BUS STH-42/BUS
STH-57 junction at Egg Barbor Rd. (4.8 miles) |
|
NHS: |
The following two segments of STH-42 in
Wisconsin are on the National Highway System (NHS):
- From southern terminus at jct STH-23 & STH-28 in
Sheboygan to I-43 at Exit
128 in Sheboygan.
- From jct I-43, US-151 & STH-42
southwest of Manitowoc to eastern jct of US-10 & STH-42
on the north side of Manitowoc.
- Concurrently with STH-57 from north of Maplewood to the Sturgeon
River Bridge at Sturgeon Bay.
- Intermodal Connector: From the Sturgeon River
Bridge at Sturgeon Bay to the northern terminus of STH-42 at
Northport. [Note: Intermodal Connectors
provide access between major intermodal facilities and the other
four subsystems making up the National
Highway System. A listing of all official NHS
Intermodal Connectors.]
|
|
Circle Tour : |
Lake
Michigan Circle Tour: From eastern jct of US-10 & STH-42 in Manitowoc to jct STH-57 in Sister Bay. |
|
Business Connections: |
BUS
STH-42 - Manitowoc: Begins at jct I-43, US-151 & STH-42
southwest of the city and runs concurrently with US-151 northeasterly
into the city via Calumet Ave & Washington St. At US-151's
terminus at US-10,
BUS STH-42 follows US-10 (along
10th St for sbd traffic and 8th St for nbd traffic) from downtown
northerly back to STH-42 north of the city. |
|
|
BUS STH-42 - Sturgeon Bay: Posted concurrently with
BUS STH-57. This is
a locally-maintained and locally-signed business routing and is not
a state trunkline highway. The route of BUS
STH-42/BUS STH-57 contains
several examples of old-style Wisconsin state trunkline markers,
which have likely been in place since this route was a part of STH-42/STH-57 through
the city in the 1970s.
|
|
Photographs: |
|
|
Weblinks: |
None. |
|
|
Southern Terminus: |
STH-42 in Gills Rock at the 90-degree intersection |
Northern Terminus: |
Island Clipper ferry dock just north of
STH-42 in Gills Rock |
Length: |
0.075 mile / 400 feet |
Maps: |
Route
Maps of SPUR STH-42 |
Notes: |
SPUR STH-42 is, by far, the shortest state
trunk highway in Wisconsin, clocking in at approximately 1/13th
of a mile, about 400 feet long. It connects STH-42 in Gills Rock
with the Island Clipper ferry dock about one block north of where
STH-42 turns easterly toward Northport (and the Washington Island
Ferry Line). Since the highway is too small to show up on most
maps, a USGS aerial photo and USGS topographic map excerpt are
provided in the "Maps" section above. |
|
This route is one of only three "SPUR"-designated
state trunkline highways in the state; the others are SPUR
US-51 in Beloit and SPUR
STH-794 in Saint Francis. |
|
Freeway/Expwy: |
None. |
|
Photographs: |
|
|
Weblinks: |
None |
|
|
Southern Terminus: |
I-90/I-39 at
Exit 185 (jct I-90/I-39 & STH-81)
in Beloit |
Northern Terminus: |
Jct I-41 & US-41/US-141 in Howard, immediately
northwest of Green Bay |
Length: |
192.01 miles |
|
Map: |
Route
Map of I-43 |
|
Notes & History: |
Originally, Wisconsin was to only be home
to two mainline Interstates: I-90 and I-94.
However, the Transportation Commission lobbied long and hard to
connect other cities in the state to the system. According to WisDOT's "Wisconsin
Highways 1945-1985," the original Interstate connection between
Milwaukee and Green Bay was to be along the route of US-41.
It notes in December 1956, "A Milwaukee-Green Bay (Hwy.
41) route was approved, but the state failed to get plans completed
in time to meet a deadline and the effort failed, according to
G. H. Blake, a legislator at the time." The Transportation
Commission tried again in March 1958 for "additional mileage
between Marinette-Milwaukee," but was turned down less than
a month later. It wasn't until the 1970s that the federal government
approved a Milwaukee-to-Green Bay Interstate connection,
although at the same time proposals for awarding Interstate status
to US-51, US-53 and
STH-29 were denied.
The WisDOT publication continues, "The location of I-43 ... was completely
altered from the original proposal to locate it midway between Hwy. 141 along
the Lake Michigan side and 41 through the Fox River Valley. The Milwaukee-Green
Bay Interstate route was the subject of a unique, computerized study by Dr. Phil
H. Lewis, UW-Madison environmental expert. The I-43 confrontation prompted one
objector to take cattle to Madison and pen them on the Capitol lawn in protest." In
the end, a compromise was made to utilize the recently completed US-141 freeway
from Milwaukee to Sheboygan, and build the rest of the route on new alignment
into Green Bay. The final segment of the original I-43 (Milwaukee-Green Bay)
opened to traffic in 1981. |
|
|
The original routing of I-43 was to only
serve as a Milwaukee-to-Green Bay Interstate connection and was
only later extended along a route Wisconsin had been trying to
have added to the Interstate system since the early days. In the
early 1970s, the federal government denied the state's request
to connect Milwaukee and Beloit with an Interstate (as well as
a companion Milwaukee-Janesville connection). Local and state officials
still saw the need in having such a connection, and momentum pushed
the project along, with or without Interstate shields and funding.
WisDOT's "Wisconsin Highways 1945-1985," notes:
One of the many highway-promoting bodies was the "Highway
15 Committee" composed of such as Eugene H. Grobschmidt, the
Milwaukee County Board Chairman; Henry W. Maier, Milwaukee Mayor;
Martin F. Schreiber, Sr., Milwaukee City Council President; Martin
F. Schreiber, Jr., a State Senator who later became Lieutenant
Governor and Acting Governor, and George Whittow, then a Milwaukee
alderman.
This committee published "15 x 72," a multi-color, 11x8-inch, 10
page promotional piece, that told why the improvement was "urgently needed
... the accommodate urban growth ... to open new areas ... to serve the Rock
River Valley ... to complete regional arterials ... and to strengthen Wisconsin's
economy." There were especially strong supportive quotes from Governor
Warren P. Knowles and Lieutenant Governor Patrick J. Lucey. Hwy. 15 was dedicated
as one of Wisconsin's last "Cadillac" highways, completed in 1976.
In 1969, the first
segment of the STH-15/Rock
Frwy freeway opened from US-45/STH-100 in
Greenfield to just west of CTH-F (now STH-164)
near Big Bend. In 1972, the year when the "Highway 15 Committee" had
hoped to have STH-15 completed
as a freeway, the Big Bend-to-East Troy segment was opened to traffic.
In 1973, the freeway was extended from East Troy to a connection
with the US-12 freeway
at Elkhorn. In late 1976, the Elkhorn to
I-90 gap was completed;
Milwaukee and Beloit were now connected by an Interstate-quality
freeway. Eleven years later, I-43 was officially extended from
Milwaukee to Beloit via STH-15 on
November 24, 1987. The route was signed as such during 1988. To
connect the two segments of the highway, the I-43 designation was
applied to I-894/Airport
Frwy and I-94/North-South
Frwy as well. By 1991, all of the exits north of Milwaukee were
renumbered to correspond with I-43's new length as measured from
Beloit. |
|
|
Although no concrete proposals exist to
extend I-43 in any direction from Green Bay, occasional rumors
to that effect do surface, which either run I-43 northerly via US-41/US-141 or northwesterly along STH-29 toward Shawano.
Site contributor Jon Enslin suggests that if any extension of I-43
were to occur at Green Bay, it may have to be rerouted onto the
STH-172 freeway to US-41. Jon notes, "At the current end of
I-43, where it exits to US-41, the interchange is not up to interstate
standards and is sitting on a protected wetland." Again, no
concrete proposals to do so currently exist, so this subject is
just conjecture at this point. —Thanks Jon! |
|
Freeway: |
Entire route. |
|
NHS: |
Entire route. |
|
Circle Tour : |
Lake
Michigan Circle Tour: four segments:
- From jct STH-32 & STH-100 at
Exit 82 in north suburban Milwaukee to STH-32 at
Exit 93 near Grafton.
- From jct STH-32 at
Exit 100 at Port Washington to jct STH-28 at
Exit 123 at Sheboygan.
- From jct STH-42 at
Exit 128 at Sheboygan to jct US-151/STH-42 at
Exit 149 at Manitowoc.
- From jct STH-54/STH-57 at
Exit 185 at Green Bay to I-43's northern terminus at US-41/US-141 at
Exit 192 in Howard.
|
|
Photographs: |
|
|
Weblinks: |
Interstate
43 - from InterstateGuide.com brought to you by the fine folks of
AAroads.com. |
|
|
Marquette
Interchange Project -
a comprehensive website all about the massive Marquette Interchange
Reconstruction Project in downtown Milwaukee from WisDOT.
Includes traffic information, a project guide, maps and up-to-date
news. |
|
|
Milwaukee
Freeways - including articles on freeways traversed
by I-43: Rock Frwy, Airport
Frwy and North-South
Frwy. |
|
|
Exit
numbers on I-43 - from WisDOT. |
|
|
Economic
Development History of Interstate: 43 Corridor -
a detailed and in-depth study by the FHWA of
the impacts of the northern portion of the I-43 corridor between
Milwaukee and Green Bay. (Interestingly, the introduction
at this site borrowed heavily, without attribution, from a
previous iteration of this website!) |
|
|
Southern Terminus: |
STH-22 in Pardeeville |
Northern Terminus: |
US-45 at cnr of Irving & Jackson Sts
in downtown Oshkosh |
Length: |
63.86 miles |
|
Map: |
Route
Map of STH-44 |
|
Notes: |
As a quick glance at a state map will reveal,
STH-44 is "diagonal" route, running from near Portage
to Oshkosh. Officially, WisDOT considers STH-44 to
be a north-south highway. However, this route's north-south difference
(when measured along a due north-south line between east-west tangents
drawn through the termini) is only 35 miles, with the east-west
difference is 38 miles, which would usually mean the route has
a more east-west "tendency" than a north-south one. But
the last word comes from WisDOT on this one, so this listing will
concur with the official findings. |
|
History: |
Today's STH-44 runs along 17 miles of the
original 1918 routing of the highway, from STH-33 to Manchester.
Back in 1918, STH-44 began in Portage and continued easterly via
today's STH-33 to northeast of Pardeeville where it turned northerly
and easterly via Kingston to Manchester, then northerly
along present-day STH-73 to a terminus at STH-23 east of Princeton.
By 1921, STH-44 had been scaled back on the south to end at STH-33 northeast of Pardeeville. By 1924, though, the route had been extended
northeasterly along its present corridor via Fairwater, Ripon and
Pickett to end in Oshkosh, as well as extended southerly through
Pardeeville and Wyocena, ending at the jct of STH-10 (now US-51)
and STH-60. In 1947, the southermost 15 miles of STH-44 from Pardeeville
southerly was redesignated as a part of STH-22. |
|
Freeway/Expwy: |
None. |
|
NHS: |
From US-41 at Exit 116 to northern terminus
at US-45/Jackson St in downtown Oshkosh. |
|
Photographs: |
|
|
Weblinks: |
None. |
|
|
Southern Entrance: |
From Illinois, 7 miles south of Bristol |
Northern Entrance: |
From Michigan (concurrently w/STH-32, which
terminates at the state line) at Land O' Lakes |
Length: |
298.04 miles |
|
Map: |
Route
Map of US-45 |
|
Notes: |
Major
changes and a major rerouting of US-45 in the Greater Fox Cities
area occurred in 2003. Until that year, US-45 ran almost due northerly
from Oshkosh to Greenville (northwest of Appleton), then turned
northwesterly toward New London. US-45 was completely relocated
from this stretch onto partly-new and partly-existing highway between
Oshkosh and New London, via Winchester. The new route generally
follows the former STH-110 corridor
from Oshkosh to Winchester, then continues northerly along the
former CTH-W and CTH-D corridors to New London. Large-scale construction
began in 2001 and was wrapped up and all roads opened to traffic
on December 5, 2003.
Today, US-45 departs its former route at
Jackson Ave in Oshkosh and heads westerly via Murdock Ave (formerly STH-21) to
Algoma Blvd (formerly STH-110), then
northwesterly through the interchange with US-41, becoming an expressway there.
The new US-45 then departs the former route of STH-110 south
of the CTH-T junction and continues as full freeway to the northeast of the old
highway (which was transferred to Winnebago Co as CTH-S) from CTH-T northwesterly
to just north a new interchange at STH-116. From north of STH-116 to just north
of CTH-G, the new US-45 freeway runs atop the former two-lane STH-110 alignment
with the freeway merging back down to the original two-lanes from north of CTH-G
to south of Winchester. Halfway through the old STH-110 "Winchester
Bypass" (1/2 mile north of Grandview Rd), the new US-45 again returns to
freeway standards with an interchange at CTH-II (former STH-150) and continues
another half-mile to a directional, free-flow "Y" interchange with
the new US-10 freeway.
US-45
continues northwesterly from the Winchester area concurrently with the new US-10 relocated
freeway closely following the former CTH-W corridor to a trumpet interchange
where US-10 continues westerly toward Fremont, while US-45 departs northerly
to follow the former CTH-D corridor toward New London. The first mile of US-45
relocated north of US-10 is constructed to expressway standards before merging
back down to the original two-lane CTH-D alignment just north of the Winnebago/Outagamie/Waupaca
Co tri-corner. US-45 utilizes the former CTH-D route for another seven miles
before veering off north of Givens Rd south of New London to meet up with the
south end of the previously-constructed New London bypass. |
|
|
WisDOT
has begun to plan for the conversion of the remaining two-lane
segment of US-45 (former STH-110)
from north of the CTH-G overpass northeast of Winneconne to Hansen
Rd south of CTH-II at Winchester to four-lane divided expressway
standards with access limited to select crossroads. WisDOT additionally
notes: "This project will
convert the existing two-lane expressway into a four-lane expressway
by adding two additional lanes to the east of US 45. Nearly a mile
of the existing lanes near Breezewood Lane and Woodland Drive will
be reconstructed to improve sight distance. Right of way will be
purchased for future frontage roads and overpass bridges, but they
will not be constructed as part of this project."
|
|
History: |
US-45 was a relative late-comer to Wisconsin,
arriving almost a decade after the first US Highways
were designated. In 1934, US-45 was extended northerly from Chicago,
running the full length of the state, before entering Michigan
heading toward its new terminus at Ontonagon. This new US Highway
was designated along the following routes:
- Replacing CTH-C from
the Illinois state line to STH-50 at Bristol.
- Replacing STH-75 from Bristol to STH-36 at
Durham.
- Concurrently with STH-36 from Durham to STH-100.
- Concurrently with STH-100 through much of Milwaukee
Co.
- Concurrently with STH-55 from northwestern
Milwaukee Co to Fond du Lac. (The STH-55 concurrency was retained
for many years.)
- Concurrently with US-41/STH-55 through downtown
Fond du Lac.
- Replacing CTH-A along the shore of Lake Winnebago from Fond du
Lac to US-41 south of Oshkosh.
- Concurrently with US-41 from south of Oshkosh
to the US-41/US-45 'split' west of Menasha at the present-day
jct of STH-76 & CTH-JJ.
- Replacing STH-26 from that point northerly
to the Michigan state line.
|
|
|
Over
the ensuing decades, a number of major improvements were made to
the route of US-45, including:
- Completion of US-41/US-45 relocated from the Granville area
(present-day northwest Milwaukee) to the US-41/US-45 "split"
south of Jackson via the present-day US-41/US-45 corridor in
1953.
- Completion of the Zoo Frwy in the Milwaukee area from Beloit
Rd northerly to North Ave in 1963, with
the southernmost 3 miles co-signed as I-894.
- Completion of the Zoo Frwy from Hales Corners to Beloit Rd
in 1966, with the portion between Beloit Rd and the Hale Interchange
co-signed as I-894.
- Completion of the Zoo Frwy from North Ave to Fond du Lac Ave
in the Milwaukee area in 1967, which completes the entire Zoo
Frwy as we know it today.
- Opening of the West Bend
Bypass as a two-lane "Super
2" highway
from US-41 northerly to CTH-D north of West Bend in the fall
of 1986.
- Completion of the West
Bend Freeway as the
other lanes of
the freeway are completed c.1990.
- Completion of the Clintonville-Marion highway as an upgraded
expressway-type highway along a former railroad right-of-way
in c.1990.
- Completion of the New London Bypass as a two-lane "Super
2" highway
around the east side of New London in c.1994.
- Opening of the Wittenberg Bypass as a near-freeway facility
(one crossroad intersection remains) in 1999.
- Myriad of route changes result from the completion of the new
US-10 freeway west of Appleton. See note above regarding these
changes and the accompanying
route change map.
|
|
Freeway: |
The
following three segments of US-45 exist as freeway:
- From jct I-43 at Exit
60 in Greenfield (southwest of Milwaukee) to the northern end
of the West Bend Frwy, 2 miles
north of West Bend (39.5 miles)
- From CTH-T northwest of Oshkosh to 1/4 mile north of STH-G
overpass northeast of Winneconne. (6.25 miles)
- From Hansen Rd south of CTH-II interchange at Winchester to
west jct of US-10 & US-45
in northwestern Winnebago Co. (4.3 miles)
|
|
Expressway: |
The
following five segments of US-45 exist as expressway:
- From jct US-41 at Exit 120 north of Oshkosh northwesterly to
the beginning of freeway segment No.2 above at CTH-T. (1.5 miles)
- From western jct of US-10 & US-45
in northwestern Winnebago Co northerly one mile to 1/2 mile north
of CTH-W. (~1 mile)
- Two-lane expressway from north of Givens Rd south of New London
along the New London Bypass to Church Rd north of New London.
- From northern jct of US-45 & STH-44 at Clintonville northwesterly
for 2.8 miles to Nietzke Rd northwest of Clintonville (2.8 miles)
- Along the Wittenberg Bypass from the eastern jct of US-45 &
STH-29 to the western jct of US-45 & STH-29. (2.6 miles)
|
|
NHS: |
The
following three segments of US-45 in Wisconsin are on the National
Highway System (NHS):
- From the south jct of US-45 & STH-36 on the Franklin/Muskego
municipal limit to STH-33 in West Bend.
- Through downtown Fond du Lac via Main st from 6th St northerly
(including 5th St/Marr St/Merrill Ave nbd and Merrill Ave/Macy
St/Western Ave sbd) to STH-23/Johnson St.
- From jct STH-44 at cnr Lincoln Ave & Jackson St in downtown
Oshkosh to
Eagle River.
|
|
Business Connection: |
BUS
US-45 - New London: A locally-designated, locally-maintained
business connection via the former route of US-45 (now CTH-D)
through the City of New London from jct US-45 & STH-15 south
of the city to jct US-45 & CTH-D north of the city. |
|
Continue on: |
US-45 southerly into
Illinois - via Rich
Carlson's Illinois Highways website.
US-45
northerly into Michigan - via the Michigan
Highways website.
US
45 -
Charles Sarjeant's Illinois
Highways Ends website. |
|
Photographs: |
|
|
Weblinks: |
US
45 expansion project - from WisDOT: "US
45 (old WIS 110) is a major north-south route through east central
Wisconsin and Winnebago County. The US 45 expansion project will develop
this route into a four-lane, divided expressway with at-grade intersections
and restricted private access." |
|
|
Future
Highway Name Changes: Effective October 31, 2003 -
a handy map produced by WisDOT illustrating
all of the various Fox Valley state trunkline route number
changes resulting from the US-10 and
US-45 relocation projects. |
|
|
Milwaukee
Freeways - including articles on freeways traversed
by US-45: Rock Frwy, Zoo
Frwy, Fond du Lac
Frwy and West Bend
Frwy. |
|
|
Exit
numbers on US 45 - from WisDOT. |
|
|
Southern Terminus: |
Jct US-63 & STH-64 near Cylon |
Northern Terminus: |
STH-35 one mile northeast of Milltown |
Length: |
34.13 miles |
|
Map: |
Route
Map of STH-46 |
|
Notes: |
|
|
History: |
STH-46
has existed in generally the same area since originally designated
in 1917, with the US-63-to-Amery stretch existing on the same alignment
to this day! In 1918, STH-46 was signed along present-day STH-65 beginning at STH-12 (now US-12) near Roberts to New Richmond, then
east concurrently with STH-64 to the current STH-46 routing, then
northerly through Amery, ending at STH-14 (now US-8). In the early
1920s, STH-46 was diverted to run southerly from STH-64 at Cylon
through Baldwin and Martell to Ellsworth, then south along what
had been STH-45 to the Red Wing bridge across the Mississippi River.
In the late 1920s, STH-46 was extended northerly from US-8 to Balsam
Lake, then westerly along present-day CTH-I to end at STH-35 at
Centuria. In 1934, US-63 debuted in Wisconsin, completely replacing
STH-46 from the Minnesota state line to STH-64 near Cylon. A year
later, STH-46 was transferred onto a more
direct alignment between US-8 and Balsam Lake and also rerouted
to follow what had been CTH-K to STH-35 near Milltown. The former
STH-46 between Balsam Lake and Centuria reverted back to its former
county designation as CTH-I. |
|
Freeway/Expwy: |
None. |
|
Photographs: |
|
|
Weblinks: |
None. |
|
|
Southern Terminus: |
STH-114 in downtown Menasha at cnr DePere & Third
Sts |
Northern Terminus: |
Jct US-51 & STH-182 in Manitowish |
Length: |
188.01 miles |
|
Map: |
Route
Map of STH-47 |
|
Notes: |
Under
normal circumstances, what is currently designated as STH-47 would
be three separate and distinct highways. But, this being Wisconsin,
the STH-47 designation was extended and elongated into a somewhat
odd routing which now stretches from the shores of Lake Winnebago
to the forests of the Northwoods, only 25 miles out of Hurley. (See "History" section
below for details on the evolution of this route.) The net
result is one highway designation residing along what could be
three separate routes, joined only via long concurrent stretches
with other highways. Between Bonduel and Keshena, STH-47 exists
along 19 miles of other highways (STH-29/STH-55 between
Bonduel and Shawano; STH-55 alone
north of Shawano) and prior to 1997, an additional 11 miles of
STH-47 from Nichols to Bonduel were also concurrently designated
with STH-55! From south
of Antigo to Rhinelander, STH-47 runs concurrently for 53 miles
with other highways (US-45 from
south of Antigo to Monico; US-8 from
there to Rhinelander). In all, 76 of the route's 188 miles are
designated with other highways, which means only 60 percent (112
miles) of STH-47 exists by itself. |
|
History: |
Originally,
STH-47 began in downtown Appleton at jct STH-15 (later US-41)
and STH-18 (later US-10)
and continued northerly in its present corridor, terminating at STH-16 (later
STH-29) at Bonduel. In
1919, though, STH-47 had been extended northwesterly via STH-16 (later STH-29)
to Shawano, then northerly along its present alignment through
Keshena and Neopit to Phlox, where the highway then "stair-stepped" into
Antigo (via present-day CTH-S and CTH-AA), ending at STH-39 (later STH-26,
now US-45) there.
By 1925, STH-47 had again been extended: from Antigo, it now
shared the STH-26 (formerly STH-39,
now US-45) route for 38
miles to Monico, then turned westerly via STH-14 (now US-8)
for 15 miles into Rhinelander. There, STH-47 continued along the
former routing of STH-39 through
Lake Tomahawk, ending at STH-10 (now
US-51) in Woodruff. In
1937 when much the original US-41 bypass
of Appleton was completed, STH-47 was extended southerly via
the former route of US-41 from
Appleton to downtown Menasha. In 1952, STH-47 was once again extended
northwesterly from its terminus at Woodruff along the route of
CTH-F through Lac du Flambeau to STH-182,
then north concurrently with STH-182 to
end at US-51 at Manitowish.
(STH-182 was 'commissioned'
in this area in 1948, hence the four-mile concurrent STH-47/STH-182 stretch.) |
|
|
With the completion of the STH-29 "Shawano
Bypass" in September 1998, the STH-47 designation was transferred
to the new freeway from the Bonduel interchange to the new BUS
STH-29/STH-47/STH-55/CTH-K interchange southeast of Shawano, adding
approximately one mile to the length of STH-47. The former STH-29/STH-47/STH-55 from Shawano to Bonduel is redesignated as CTH-BE and turned back
to local control. |
|
Freeway: |
Concurrently with STH-29/STH-55 from
Bonduel to the new CTH-K interchange southeast of Shawano. (6.8
miles) |
|
Expressway: |
Concurrently with US-8 via the "Rhinelander
bypass" from CTH-C near George Lake to jct US-8 [west] & BUS
US-8 in Rhinelander. (6.1 miles) |
|
NHS: |
The following three segments of STH-47 in
Wisconsin are on the National Highway System (NHS):
- From US-10/STH-441 south of downtown Appleton to US-41 at
Exit 142 on the north side of Appleton.
- Concurrently with STH-29 and STH-55 from Bonduel to Shawano.
- From the southern jct of US-45 & SR-47
north of Aniwa to the western jct of US-8 & SR-47
in Rhinelander.
|
|
Photographs: |
|
|
Weblinks: |
None. |
|
|
Western Terminus: |
Jct STH-70 & STH-87 in Grantsburg at
cnr Pine St & Skyline Dr |
Eastern Terminus: |
STH-40 two miles east of Exeland |
Length: |
98.19 miles |
|
Map: |
Route
Map of STH-48 |
|
Notes: |
|
|
History: |
The first iteration of STH-48,
as designated in 1917, began at Sheboygan and proceeded northwesterly
through New Holstein and Chilton, ending at STH-18 (later US-10)
at Hilbert. By 1921, STH-48 had been scaled back from Hilbert to
end in New Holstein at STH-57 (which then ran along present-day
CTH-J south of Holstein). By 1924, though, STH-32 had replaced
all of the remaining original STH-48 near Sheboygan. |
|
|
The current iteration came
about when the STH-48 was commissioned BY 1924 along a former county
road from Rice Lake, through Cumberland and Loraine (now McKinley)
to Luck, then north along STH-35 to Frederic, west again through
Trade Lake to STH-87, then northerly co-signed with STH-87 to end
at STH-70 in Grantsburg. (Why STH-48 and STH-87 were concurrently
designated is yet unclear.) In 1956, STH-48 was extended northeasterly
from Rice Lake by an additional 50 miles to its present eastern
terminus near Exeland. |
|
Freeway/Expwy: |
None. |
|
Photographs: |
|
|
Weblinks: |
None. |
|
|
Southern Terminus: |
US-41 at Exit 87 two miles north of Lomira |
Northern Terminus: |
STH-29 four miles west of Wittenberg |
Length: |
127.52 miles |
|
Map: |
Route
Map of STH-49 |
|
Notes: |
This is one of those trademark WisconsinHighways™ which
seem to jump from one logical alignment to another, as well as
change direction a couple times. It could be argued that the current
STH-49 routing would be four different highways under other circumstances.
First, from STH-29 to Waupaca, STH-49 seems to follow one logical
alignment, but is then concurrently designated with US-10 from
Waupaca to Fremont, where it then departs south again along
a second logical alignment to Green Lake. From there to Ripon,
STH-49 moves laterally via STH-23, then south again on a third
logical alignment to Waupun, where it makes a 90 degree angle to
run easterly along a fourth logical alignment between Wapun and
US-41. Then again, that's one of the reason's why Wisconsin's highway
system is interesting... |
|
History: |
As originally designated in 1917, STH-49
followed the second of the so-called "logical alignments" from
above, from Green Lake to near Fremont. By 1921, STH-49 had been
extended along the stair-step route from Green Lake, through Ripon
and Brandon, to end at STH-31 (later US-151) & STH-33 (now
STH-68) in Waupun. By 1924, STH-49 had been extended northwesterly
along STH-18 (now US-10) to Waupaca, then northerly generally along
its present routing, replacing STH-87 from Waupaca to the present
jct with STH-66 east of Rosholt, then replacing STH-66 northerly
toward Wittenberg. In 1947, STH-49 was extended easterly from Waupun
along a route which had not previously been a state trunk highway,
to end at US-41. The portion through the northern end of the Horicon
NWR was a lesser-quality roadway at first. In 1954, approximately
a mile was tacked on to the south end of STH-49 when US-41 was
constructed on its present alignment (albeit as a two-lane highway,
not the current freeway) near Lomira. |
|
Freeway: |
Concurrently
with US-10 along the "Waupaca
bypass" from jct US-10,
STH-49 & STH-54 easterly
to the end of the freeway segment at CTH-A east of Waupaca. |
|
Expressway: |
Concurrently
with US-10 from the eastern
end of the "Waupaca bypass" freeway at CTH-A easterly
to jct US-10,
STH-49 & STH-110 at
Fremont. |
|
NHS: |
Concurrently with US-10 from just west of
Fremont to Waupaca. |
|
Photographs: |
|
|
Weblinks: |
None. |
|
|
STH-40 | I-41 | US-41 | STH-42 | SPUR
STH-42 | I-43 | STH-44 | US-45 | STH-46 | STH-47 | STH-48 | STH-49 | Up
to Top |
|
|
|